Start with a clear equipment plan
Hardware specifications, purchase documentation, and the deployment environment give the financing team a defined asset to assess.

NVIDIA systems
Current Blackwell platforms and the next generations NVIDIA has announced.
GB300
Rack-scale Blackwell Ultra system: 72 GPUs and 36 Grace CPUs, liquid-cooled.
NVIDIA GB300GB200
Rack-scale Blackwell system: 36 Grace Blackwell Superchips, liquid-cooled.
NVIDIA GB200B300
Eight Blackwell Ultra GPUs on an HGX baseboard for x86 servers.
NVIDIA B300B200
Eight Blackwell GPUs on an HGX baseboard for x86 servers.
NVIDIA B200Vera Rubin
Rack-scale Rubin system: 72 GPUs and 36 Vera CPUs, liquid-cooled. In production.
NVIDIA Vera RubinRosa Feynman
The generation after Vera Rubin, pairing Feynman GPUs with the Rosa CPU. On NVIDIA's 2028 roadmap.
NVIDIA Rosa Feynman
AMD Instinct systems
Current Instinct accelerators and the next generation AMD has announced.
Instinct MI355X
CDNA 4 accelerator with 288 GB HBM3E; direct liquid cooling in 8-GPU platforms.
AMD Instinct MI355XInstinct MI350X
CDNA 4 accelerator with 288 GB HBM3E; air-cooled 8-GPU platforms.
AMD Instinct MI350XInstinct MI455X
CDNA 5 accelerator with 432 GB HBM4, in AMD's Helios rack. Shipping from the second half of 2026.
AMD Instinct MI455X
Document the equipment schedule
A defined asset starts with the system, the quantity and the place it will run.
System model and configuration
Quantity and supplier
Purchase order or fleet records
For deployed servers, ownership information and existing financing obligations.
Deployment site and colocation agreement
Power and cooling plan
Technical suitability is not loan eligibility
A system can suit a workload without meeting the financing program's requirements. Equipment and transaction eligibility are reviewed individually, alongside the customer revenue that repays the loan.
